Proj. Of Changing from the first floor into 3 story building.
2019.3
Checking all plan.
Already he got the approval
2019.4
Renewal of the permit and small amendmentof the plan.
2019.5
Almost ready.
2019.6
Signed on the contract. Maybe on june.
2019.7
Ready to go. Starting from small demonof thenfirst floor
No basement
열심히 뛰어가자.. 나아가자......
It was parking lot. Now it is outside part of the restaurant.
2019.8
2019.9
2019.10
2019.11
2019.12
2020.1
2020.2
2020.3
2020.4
웬 복병. 코로나
2020.5
2020.6
2020.7
무더운 여름
거의
유리 다는 로봇
거의 끝나가는
옆의 오픈카페를 위한
엘벹 앞
2020.8
아침 베이글
Oh. Mr. Luis
Mr. Miguel
Water main
2020.9
메자닌
2020.10
It was done on Nov. 2021
We had hard time because of COVID 19 and many obstacles, but finally the construction is all done and inspection all passed. Thanks a lot.
some cut of film in the middle....